Customer:
Fording Coal Limited –
All Elk Valley Operations
Description: Crusher
Location: Elk
Valley, BC
Since
1979
We operate a crusher
throughout the year, crushing drilled 300 mm blasted rock for the
mines in the Elk Valley. This completely mobile crusher operates
around the clock with production of between 300 and 500 tonnes per
hour. A 990 Wheel Loader (load and carry) feeds the crusher, which
has produced over one million tonnes of crush annually for our customer
throughout the valley.