Customer:
BC Ministry of Forests
& Galloway Lumber
Description: Replacing
a forestry bridge after a major wash-out.
Location: Bull
River, BC
April
1997
We cleaned up site after
a flood and reconstructed a bridge 24 feet above the Bull River
on a narrow foundation using a 110 ton Krupp Crane. Site was 25
miles off the highway on a logging road.